기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
ANSYS를 이용한 스캐폴딩 시스템 타워 구조 건전성 평가에 관한 법공학적 연구
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • ANSYS를 이용한 스캐폴딩 시스템 타워 구조 건전성 평가에 관한 법공학적 연구
저자명
김종혁,김의수,박우식,문병선,고재모,박남규,윤기봉,조성욱,Kim. J.H.,Kim. E.S.,Park. W.S.,Moon. B.S.,Goh. J.M.,Park. N.K.,Yoon. K.B.,Cho. S.W.
간행물명
한국안전학회지
권/호정보
2013년|28권 6호|pp.42-48 (7 pages)
발행정보
한국안전학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

Forensic engineering is the application of engineering principles covering the investigation of constructed facilities and systems that fail to perform as intended, causing personal injury or damage to property, environmental, economy etc. In the year 2012, two collapsed accidents of the large scaffolding system in national thermal power station occurred one after another, causing many casualties. In this study, we had performed to investigate the collapsed accident of scaffolding system occurred in the a thermal power station of two accidents. First, the investigation about the collapsed accidents site had performed to understand collapsed state and structures of the scaffolding system. Second, reviewing the materials concerning about the applied weight on the scaffolding system had performed. The applied weight is sum of the weights of the 15 workers, additional materials for coating work and dispersed and loaded shot ball on the foothold etc. the applied weight that calculated exceed more three times than the safe working load. Third, we had confirmed the install state of the materials of the scaffolding system by reviewing the quantity of the materials on the manual and the real system. Last, structural analysis had performed to evaluate structural integrity of the scaffolding system using Ansys. Through a series of this processes, the definite accidents causes of the collapsed scaffolding system revealed. Through these studies, the collapse accident that may occur in the scaffolding system in thermal power station can be minimized by performing specialized and systematic investigation on the accidents in terms of Forensic engineering.