기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
저수지의 유역대 가리면적비의 연구(I)
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 저수지의 유역대 가리면적비의 연구(I)
저자명
김동규
간행물명
農工學會誌= Journal of the Korean society of agricultural engineers
권/호정보
1968년|10권 2호|pp.1443-1453 (11 pages)
발행정보
한국농공학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

The reservoir is one of the important partsof facilities for development of irrigation water in Korea. Accordingly, construction of the reservoir will be stressed in the field of future development of agricultural water resources. In the meantime, storage capacity is actually is limited to some extent with various conditions. Acreage of benefited area shall be determined according to such conditions as catchment area, precipitation and unit water requirment within benefited area. According to results of the past construction of the reservoir, the ratio of catchment area to benefited area would be 4:1 to 2.5:1 or catchment area is approximately 2.5 times larger and over than benefited area. In order words, it is the ordinary practice in the construction of reservoir that benefited area should be less than 1/2.5 times as large as catchment area. Moreover, limitation of catchment area would prevent largely the vast drought-stricken area from being benefited by irrigation facilites. This has been, in fact, caused by the fact that a good deal of water stored in the reservoir overflows wastefully through spillway of the reservoir at th time of flood season, and that only very little of the overflowed water is available for irrigation. However, if the more wasted water is stored during the flood season, the larger area of farmland can irrigated. That is, catchment area can reduced to less than 2.5 times as large as benefited area. On the other hand, it is afraid that such reduction should bring about the increase of unit storage capacity. And storage capacity being maximized, costs for construction of the reservoir will be raised too highly, thus making the economics feasibility unfavorable. The purpose of this study is to decide the ratio of catchment area to benefited area toward the minimum level as possible in consideration of the hydrological and economic aspects. Kopung Project which is located in Sosan-kun, Chungnam Province is taken as an example for the review and analysis in this study, and as an example for crop, rice is taken. After consideration of this project, we can find out that annual average inflow is 726mm and annual average water requirements is 811mm. And the ratio of catchment area to benefited area is 1.2:1. This means that catchment area can be reduced even to 1.2 times as large as benefited area. In conclusion, this study reveals that the construction of reservoir is feasible in view of economic and technical points provided that catchment area is more than 1.5 times as large as benefited area.