- 긴급선행기간을 이용한 MRP 시스템
- ㆍ 저자명
- 남선희,윤원영,Nam. Sun-Hee,Yun. Won-Young
- ㆍ 간행물명
- 산업공학
- ㆍ 권/호정보
- 1991년|4권 1호|pp.47-61 (15 pages)
- ㆍ 발행정보
- 대한산업공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
This paper develops MRP system with two-types of lead time(average lead time and emergent lead time). In this proposed MRP system, Material Requirement Planning is scheduled by using average lead time, but the emergent lead time is used only when start date of planned order is past. Btrieve data management technique and Stack structure are used for recalculating procedure of planned order with the TURBO PASCAL Version 5.5. An example is also considered.