- 암반기계굴착공법의 적용연구
- ㆍ 저자명
- 박철환,김길수,Park. Chul-Hwan,Kim. Kil-Soo
- ㆍ 간행물명
- 터널과 지하공간: 한국암반공학회지
- ㆍ 권/호정보
- 1992년|2권 1호|pp.177-189 (13 pages)
- ㆍ 발행정보
- 한국암반공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
As tunnel becomes longer and larger, TBM has become one of the most popular methods of excavatio in rock. This paper describes the degree of operation the degree of availability and penetration rate of TBM and TBE applied in Namsan roadway tunnelling site. Net penetration rate was 1.62m/hr for TBM and 0.72m/hr for TBE. Net penetration rate showed no direct relation to daily advance or penetration time, but the lower bound of penetration rate could be obtained from the relation with daily advance. For both of TBM and TBE, the degree of operation and the degree of availability were 33.8% and 68.6% respectively. Life time of normal cutter was $310m^3$ for TBM and $194m^3$ for TBE, while that of center and gauge cutter was about $50m^3$. When the two machines were compared, TBM showed 80% higher penetration rate, and 40% shorter life time of cutter.