교각건설로 인한 나로도 협수로 부근해역에서의 조류변화 수치모형 실험
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 교각건설로 인한 나로도 협수로 부근해역에서의 조류변화 수치모형 실험
  • Numerical Model Experiments on the Tidal Current Variations Due to the Bridge Piers Construction near the Straits of Narodo Islands
저자명
이문옥,LEE. Moon-Ock
간행물명
한국수산학회지: Bulletin of the Korean Fisheries Society
권/호정보
1994년|27권 1호|pp.47-58 (12 pages)
발행정보
한국수산학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

Field observation and numerical experiments with a two-dimensional depth-integrated model were undertaken in order to investigate some of the effects on the flow structure resulting from the construction of a bridge connecting Kohung Peninsula and the Narodo Islands on the southern coast of Korea. Tidal currents passing through the straits between the Narodo Islands showed that, although the phase lagged one hour behind that passing through the strait between Kohung Peninsula and Naenarodo Island, it still kept strong flows of more than 80cm/sec near the bottom. The seawater temperature and salinity within the study area seemed to be higher southward but uniform vertically. The results of the drogue experiments in the straits between the Narodo Islands showed that the drogues moved northward of Sayangdo in the early part of the flood tide, but southward in the late part of the flood tide and finally stopped a mile from the east coast of Surakdo. On the other hand, the numerical computation showed that the flow structures after construction of the bridge piers were basically in line with those before construction of the bridge piers, except for the slight variations of velocities in the vicinity of the bridge piers. A large scale clockwise circulation has been confirmed in the south area of Namsungri of Kohung Peninsula from the computational results of tide-induced residual currents. Referring to these computational results, the impact category on the flow structures due to the bridge piers construction has been estimated to be within around 2km. The results were in good agreement with the field observations.