- 직렬 다단계 생산공정에서의 최적 검사노력 할당문제에 관한 연구
- A Study on Allocation of Inspection Efforts in Serial Multi-stage Production Systems
- ㆍ 저자명
- 김창훈,윤덕균
- ㆍ 간행물명
- 공업경영학회지
- ㆍ 권/호정보
- 1995년|18권 36호|pp.167-174 (8 pages)
- ㆍ 발행정보
- 한국산업경영시스템학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
The Dynamic programming method are developed for determining where to assign the inspection efforts in serial multi-stage production systems. The objective function is formulated to minimize the inspection and repairing costs. One of the major assumptions in this systems is that every assigned inspection stations should inspect the only items produced in manufacturing stages after the previous inspction station. The inspection stations can be assigned at every possible inspection stage after the manufacturing stages. Two type error is considered and screening inspection policy is assumed in this system and the defective items detected in tile inspection stations will be repaired or scraped by the defective types.