- 대규모 병렬기계 흐름생산의 재일정계획
- ㆍ 저자명
- 정남기,유철수,김종민,최정길,Chung. Nam-Kee,Yoo. Chul-Soo,Kim. Jong-Min,Choi. Jeong-Gil
- ㆍ 간행물명
- 산업공학
- ㆍ 권/호정보
- 1996년|9권 2호|pp.75-82 (8 pages)
- ㆍ 발행정보
- 대한산업공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
A scheduling system is developed for a parallel machine flow shop which reflects the situations of the manufacturing processes in the tire industry. The schedule is generated via simulation using heuristic rules to get satisfaction on such constraints as due dates, demands, work-in-process, process capacity, set-up times and scheduling speed. This system, constructed with relational DB, SQL and C language, consumes less than 10 minutes of PC simulation to handle real size problems.