- 조기 준비기간과 후공정을 갖는 생산시스템의 분석
- ㆍ 저자명
- 김승찬,이호우,안부용
- ㆍ 간행물명
- 韓國經營科學會誌
- ㆍ 권/호정보
- 1997년|22권 3호|pp.99-111 (13 pages)
- ㆍ 발행정보
- 한국경영과학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
We consider a production system with post-operation and early set-up. As soon as there are no more units(raw materials) to process and the machine becomes idle, it undergoes a post-operation. After the post operation, if the number of waiting units is greater than or equal to m, it begins a set-up. After the set-up, if the number of units is greater than or equal to N($geq$m), it begins to process the units. We first analyze the system by employing the decomposition property of the vacation queue. We, then, propose an algorithm that finds the optimal threshold values ($m^*$, $N^*$). Finally we present some numerical examples and interprete the system behavior.