기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
롱샹 성당의 설계 변형 과정 연구
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 롱샹 성당의 설계 변형 과정 연구
저자명
이정규,Lee. Jeong-Kyu
간행물명
건축역사연구 : 한국건축역사학회논문집
권/호정보
1999년|8권 1호|pp.81-94 (14 pages)
발행정보
한국건축역사학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

This Study aims at searching the meanings in the creative process of Ronchamp chapel by analyzing the drawings of the site, plan, section and elevation in chronological order. The origins of his architectural creation are identifying with the site(memories of Acropolis), analogies of crab shell, air plane wing and hydraulic dams. The architect informed himself about the site ,the tradition of pilgrimage associated with the place, and its devotion to the Holy Virgin; he looked into the rituals of the Catholic religion, spoke with ecclesiastics; he studied and annotated a monograph devoted to the site of Ronchamp. Also ,the plan required that it be possible to collect rainwater, since such was rare on the hill. In the first design phase, overall conception of building was carried out in the sketches and drawings from June 1950 to November 1950. The second phase in the elaboration of the project was from January 1951(at which time preliminary project was presented to the Commission of Holy Art) to April 1953. The modifications made were in response to opinions expressed by the patrons. The building moved to east and gargoyle moved to west, then, the elevations of north and west were changed. He designed the artificial land and bell tower from the first phase even after the beginning of construction ,he wanted them to be built .But they were not constructed, so the outer space for rituals of religion had no tension. I concluded that Le Corbusier had gifted ability and efforts to create spontaneous birth(after incubation) of the whole work, and the execution of drawings itself. He devoted himself to accomplish the project in spite of the change in situation or by clients.