- 다중 플랜트 체인 구조에서 공정계획과 일정계획의 통합
- ㆍ 저자명
- 문치웅,김규웅,김종수,허선,Moon. Chi-Ung,Kim. Kyu-Woong,Kim. Jong-Soo,Hur. Sun
- ㆍ 간행물명
- 산업공학
- ㆍ 권/호정보
- 2000년|13권 3호|pp.388-395 (8 pages)
- ㆍ 발행정보
- 대한산업공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
In this paper, we propose an approach for integrated process planning and scheduling through analysis of the alternative operations sequences and machine selection in supply chain with multiple plants. It takes into account such factors alternative machine, alternative operations sequences, setup time, transportation time between plants, along with other manufacturing factors. The objective of the model is to minimize makespan of machine schedules for all parts, determines operations sequence for each part, and selects a machine for each operation simultaneously. Examples are presented to demonstrate the effectiveness of the proposed approach.