수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測)
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測)
저자명
박창규,이남호,Park. Chang-Kyu,Lee. Nam-Ho
간행물명
농촌계획 : 韓國農村計劃學會誌
권/호정보
2001년|7권 1호|pp.61-76 (16 pages)
발행정보
한국농촌계획학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

During the performance of large scale tidal land reclamation project along the coast line, the construction of large scale structures such as sea-dikes, closing estuaries will induce big changes of near-shore hydraulic behavior. In this paper, its is aimed to verify the change of tide and currents after the construction of sea-dike of the Saemangeum project along the coast line. Numerical scale model "TRISULA" which development by Delft Hydraulics in the Netherlands was used. "TRISULA" is adopting the finite difference numerical scheme, and mostly using for hydro-dynamic solution along the sea and estuaries. Model boundary is covering $100{ imes}170$ Km and constructed with $133{ imes}337$ grids. Outer side boundary is divided 48 sections, and input 37 tidal components are gained from another big scale numerical "Yellow Sea" model. Model calibrations & verifications were performed th field tide & current datas which were measured along sea-dike alignment during Aug. $1997{sim}Apr$. 1999. And then, numerical simulation with the tide condition dated 17 Apr. 1999 was performed with & without sea-dike construction condition for the comparison. Evaluated boundary is 20 km out-side from sea-dike alignment. Four cross lanes were set up, each of lane contains 3 points, for the comparison of sea-dike construction effects. Results showing the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition, amplitude 6.9m. Currents after construction of sea-dikes along the alignment, the northern part shows 50%(inner), 90%(outer) and the southern part shows 10%(inner) 50%(outer) of the currents before construction.