기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
상정사고를 고려한 배전용 변전소 신,증설 계획 수립
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 상정사고를 고려한 배전용 변전소 신,증설 계획 수립
저자명
최상봉,김대경,정성환,Choi. Sang-Bong,Kim. Dae-Kyeong,Jeong. Seong-Hwan
간행물명
전기학회논문지. The transactions of the Korean Institute of Electrical Engineers. A / A, 전력기술부문
권/호정보
2001년|50권 7호|pp.303-308 (6 pages)
발행정보
대한전기학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, firstly, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting. Secondly, goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally, it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio. To verify proposed algorithm, at first, after adopting a part of Kangnam area in Seoul as area for testing, it is divided into several regions for this area according to power branches of power utility. Secondly, by deriving correlation factor between load demand and economic indicators in these region respectively, the regional load forecasting was performed with economic growth and city plan scenario. Finally, based on the predicted load demand by region and land use data which is identified from air-photographic, the load demand by district was predicted. Also, planning for substation considering contingency is formulated to expand taking into account computing utilization factor which is based on configuration of substation bank respectively.