- 장비능력에 의존적인 처리시간을 가진 애로공정의 일정계획 수립(몰드변압기 공장을 중심으로)
- ㆍ 저자명
- 서준용,고재문,Seo. Jun-Yong,Koh. Jae-Moon
- ㆍ 간행물명
- 산업공학
- ㆍ 권/호정보
- 2001년|14권 4호|pp.385-393 (9 pages)
- ㆍ 발행정보
- 대한산업공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
In this paper, a scheme of scheduling a bottleneck operation is presented for production planning of make-to-order. We focus on the problem of capacity-dependent processing time in which processing time of the bottleneck operation is not fixed, but varies with job sequence or equipment capacity. For this, a genetic algorithm is applied for job sequencing with an objective function of mean square of weighted deviation. An experimental study is implemented in power transformer plant and results are compared with those of the EDD rule. It shows that the genetic algorithm is relatively good for most cases.