- 산출내역서.공정 통합관리 모형 구축에 관한 연구
- ㆍ 저자명
- 박홍태,박찬정,Park. Hong-Tae,Park. Chan-Jeong
- ㆍ 간행물명
- 한국건축시공학회지
- ㆍ 권/호정보
- 2002년|2권 4호|pp.153-161 (9 pages)
- ㆍ 발행정보
- 한국건축시공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.