기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
3-Dimensional Building Reconstruction with Airborne LiDAR Data
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 3-Dimensional Building Reconstruction with Airborne LiDAR Data
  • 3-Dimensional Building Reconstruction with Airborne LiDAR Data
저자명
Lee. Dong-Cheon,Yom. Jae-Hong,Kwon. Jay-Hyoun,We. Gwang-Jae
간행물명
Korean journal of geomatics
권/호정보
2002년|2권 2호|pp.123-130 (8 pages)
발행정보
한국측량학회
파일정보
정기간행물|ENG|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

LiDAR (Light Detection And Ranging) system has a profound impact on geoinformatics. The laser mapping system is now recognized as being a viable system to produce the digital surface model rapidly and efficiently. Indeed the number of its applications and users has grown at a surprising rate in recent years. Interest is now focused on the reconstruction of buildings in urban areas from LiDAR data. Although with present technology objects can be extracted and reconstructed automatically using LiDAR data, the quality issue of the results is still major concern in terms of geometric accuracy. It would be enormously beneficial to the geoinformatics industry if geometrically accurate modeling of topographic surface including man-made objects could be produced automatically. The objectives of this study are to reconstruct buildings using airborne LiDAR data and to evaluate accuracy of the result. In these regards, firstly systematic errors involved with ALS (Airborne Laser Scanning) system are introduced. Secondly, the overall LiDAR data quality was estimated based on the ground check points, then classifying the laser points was performed. In this study, buildings were reconstructed from the classified as building laser point clouds. The most likely planar surfaces were estimated by the least-square method using the laser points classified as being planes. Intersecting lines of the planes were then computed and these were defined as the building boundaries. Finally, quality of the reconstructed building was evaluated.