- 중간저장조의 저장시간과 저장제품의 제약을 고려한 다품종 회분공정의 조업완료시간 알고리듬
- ㆍ 저자명
- 하진국,이경법,이인범,이의수
- ㆍ 간행물명
- 제어·자동화·시스템공학 논문지
- ㆍ 권/호정보
- 2003년|9권 9호|pp.727-735 (9 pages)
- ㆍ 발행정보
- 제어로봇시스템학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
The determination of completion time constitutes an important step in developing algorithms for short-term production scheduling. Existing completion time algorithms of multi-product batch processes often assume that intermediate storage tanks are always available when it is needed. In this paper, we consider a serial multi-product batch plants with ZW and NIS policy intermediate storge tank. We limit storage residence time and allocated products in the intermediate storage tank to minimize the quality change of the stored material as well as to reduce the clearing time during product change. A set of recurrence relations is suggested to calculate the completion times for the given batch sequence of products on all processing units. Also analytic solution for the suggested model is solved by a graphical method. The effectiveness of these results is proved by a few illustrative examples.