- 연구로 안전 해체를 위한 스케쥴링 최적화
- ㆍ 저자명
- 김태성,박희성,이종환,장성호,김상호,Kim. Tae-Sung,Park. Hee-Seoung,Lee. Jong-Hwan,Chang. Sung-Ho,Kim. Sang-Ho
- ㆍ 간행물명
- 대한안전경영과학회지
- ㆍ 권/호정보
- 2006년|8권 3호|pp.67-75 (9 pages)
- ㆍ 발행정보
- 대한안전경영과학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.