- 선박건조공정의 미세 통합 일정 관리 체계 구축에 관한 연구
- ㆍ 저자명
- 김용섭,이대형,Kim. Yong-Seop,Lee. Dae-Hyung
- ㆍ 간행물명
- 大韓造船學會 論文集
- ㆍ 권/호정보
- 2007년|44권 1호|pp.48-54 (7 pages)
- ㆍ 발행정보
- 대한조선학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.