- 회야강 하구방사제 건설에 따른 진하해수욕장 해안선 변화분석 및 예측
- ㆍ 저자명
- 김성득,강경호,박해성,Kim. Seong-Deuk,Kang. Kyung-Ho,Park. Hae-Sung
- ㆍ 간행물명
- 韓國海洋工學會誌
- ㆍ 권/호정보
- 2008년|22권 2호|pp.28-33 (6 pages)
- ㆍ 발행정보
- 한국해양공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
From the 1997 to January, 2004, a groin 156m long was constructed at the mouth of the Heoya river-mouth as a protection and barrier. To understand the changes to Jinha beach from the blockade of the river mouth, several aerial photographs, etc., were compared, which showed that the changes were significant. Comparing these results to the state of the area before construction of the groin, the blockade of the river was relaxed, but the formation of the tombolo, in the middle groin area was accelerated and the total Jinha beach erosion and especially the erosion of the southern part of Jinha beach was developed. But according to statements by residents and some current documents, the blockade of the Heoya-river mouth is still underway at the surrounding areas of the groin and chronic dredged sand has been used for littoral nourishment at the northern part of the middle groin and on Jinha beach. The result of numerical simulation based on the present state shows that if this sort of dredging is stopped, the sand accumulation will progress near the river mouth groin and the existing tombolo at the middle groin will progress to the north and severe erosion will occur at the southern coastline near the middle groin and the farthest southern part of Jinha beach, and Jinha beach itself will experience a gradual erosion. The main reason for these erosions should be the typhoons that are happening during the summer season. To provide protection from these kinds of undesirable erosions, a total of 23 numerical simulations have been done. It has been shown that submerged breakwaters at the front area of the beach will be efficient to protect from main beach erosion, but there should be alternative proposals for the influence of the river mouth blockade.