- 풍력단지 출력 검증을 위한 기상탑의 최적위치 선정
- ㆍ 저자명
- 오기용,이준신,박준영,이재경,김지영,Oh. Ki-Yong,Lee. Jun-Shin,Park. Joon-Young,Lee. Jae-Kyung,Kim. Ji-Young
- ㆍ 간행물명
- 신재생에너지
- ㆍ 권/호정보
- 2009년|5권 2호|pp.31-38 (8 pages)
- ㆍ 발행정보
- 한국신재생에너지학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
The performance test of a wind turbine in a wind farm is generally carried out by the owner to verify the power curve of the wind turbine given by the turbine manufacturer. The international electro-technical commission provides the IEC 61400-12-1 standard on "Power performance measurements of electricity producing wind turbines". By using this code, one can easily find the suitable met-mast (meteorological mast) location for the wind data whether a wind farm is potential or already built. In this paper, the valid sectors for wind turbines installed in the HanKyoung wind farm, south-west in Jeju island are analyzed on the basis of the code by considering the wind farm layout. Among these sectors, the optimal met-mast location is presented for the power curve verification of the wind farm.