- 다수 자원제약 하에서의 프로젝트 일정계획에 관한 연구
- ㆍ 저자명
- 이정훈,김판술,문일경,Lee. Jeong-Hun,Kim. Pan-Sool,Moon. Il-Kyeong
- ㆍ 간행물명
- 대한산업공학회지
- ㆍ 권/호정보
- 2010년|36권 4호|pp.219-229 (11 pages)
- ㆍ 발행정보
- 대한산업공학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
The PERT/CPM are considered as the base procedures for the most successful project scheduling programs. Unfortunately, it is not easy to apply these procedures to real-life projects. This is due to the fact that PERT/CPM assume an infinite number of resources for each activity in project networks. Obviously, the completion time under no constraints is less than when constraints are imposed. One way of approaching this problem is to use heuristic solution techniques. In this paper, we present three heuristics; MRU (Maximum Resource Use) rule, STU (Shortest Time Use) rule, MRUP (Max Resource Use and Period) rule for allocating resources to activities of projects under multiple resource constraints. Comparisons of the project durations show that these heuristic rules are superior to AG3 rule that has been widely used in practice (Elsayed and Boucher, 1994).