기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
Risk Assessment Using Event Tree Analysis for Sustainable Concrete Structures with Construction Management in Vietnam
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • Risk Assessment Using Event Tree Analysis for Sustainable Concrete Structures with Construction Management in Vietnam
  • Risk Assessment Using Event Tree Analysis for Sustainable Concrete Structures with Construction Management in Vietnam
저자명
Phan. Quy Thanh,Noguchi. Takafumi
간행물명
International journal of sustainable building technology and urban development
권/호정보
2010년|1권 2호|pp.143-151 (9 pages)
발행정보
친환경건축연구센터
파일정보
정기간행물|ENG|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

After the collapse of Can Tho Bridge, a severe accident with 54 people dead and 80 injured, the risk assessment of sustainable concrete structures for Vietnam construction industry becomes an extremely important subject. In spite of many accidents in construction, there is still no research in the risk management of construction industry in Vietnam. Based on the situation, "Development of Risk assessment system for Sustainable Concrete Structures with Construction Management in Vietnam" has been conducted. The first survey was conducted with the cooperation of experienced person who has responsibility in construction-related companies in Vietnam. In order to collect actual data concerning the cause, the type and the probability of various incidents, the repair cost after the failure occurrence and the proactive cost with purpose of incident prevention to prolong the life of concrete structures and reduce the life cycle cost in Vietnam. As a result of this investigation, Event Tree Analysis (ETA) is used to classify and evaluate the damage form, identifying the occurrence probability and the cost of loss. This research estimates 26 types of failure (hazards) which might be occurred in concrete construction, based on the assumption that hazard occurred dependently. Based on ETA, each failure is disposed into 4 cases. Some case of risk curves are used to identify and evaluate the sequence of events in the failures. By this result, construction companies in Vietnam have been aware of preventing construction failure that might be occurred. Comparison was made between the results in Vietnam and those in Japan to find out appropriate measures to minimize the risk in concrete construction.