TACT 공정기법의 작업 유형 분류를 통한 진도관리 개선 방안에 관한 연구
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • TACT 공정기법의 작업 유형 분류를 통한 진도관리 개선 방안에 관한 연구
저자명
이승훈,최청균,김주형,김재준,Lee. Seung-Hoon,Choi. Chung-Gyun,Kim. Ju-Hyung,Kim. Jae-Jun
간행물명
大韓建築學會論文集 : Journal of the architectural institute of Korea : Structure & construction / 構造系
권/호정보
2011년|27권 1호|pp.215-222 (8 pages)
발행정보
대한건축학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

In apartments, cost of finishing work comprises a large part of gross construction costs, and also subcontractors put in apartment finishing work outnumber those put for its structure construction by far. As various processes take place at the same time, period of construction widely differs depending on management ability of the constructors. But in most cases, a difference between plan and outcome is caused by incorrect process plan and inefficiency of process management during finishing work. For this reason, field administrators should make sure of precise process by measuring the workload required for finishing work and reflect it to the actual construction. Finishing work in apartments means follow-up works after structural construction and with a number of divided process, is composed of very various and complicated elements. TACT scheduling method, which enhances work efficiency and maintains smooth flow of work by application to the repeated process like finishing work, is a reasonable progress control technique that may reduce the probability of construction delay or rise of construction costs. This study classifies minimum work types applicable to TACT method to maintain efficient flow of work and reflects actual accomplishment ratio to progress control. And eventually it aims to provide construction participators with information needed to establish process plan of finishing work.