기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
해상풍력발전 단지배치에 따른 민감도 분석에 관한 연구
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 해상풍력발전 단지배치에 따른 민감도 분석에 관한 연구
저자명
김도형,장은영,경남호,김홍우,김성완,김창석,Kim. Do-Hyung,Jang. Eun-young,Kyong. Nam-Ho,Kim. Hong-Woo,Kim. Sung-Hwan,Kim. Chang-Suk
간행물명
한국태양에너지학회 논문집
권/호정보
2011년|31권 3호|pp.29-35 (7 pages)
발행정보
한국태양에너지학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

This study draws economic expense factors according to the influence of generation resulted from slipstream and the arrangement of the complex when arranging and designing the complex for offshore windpower development as a model of 50MW offshore wind farm and conducts economics analysis. According to the result of the analysis, O (Optimize) arrangement was the one that has the highest generation for having the best windpower resources in terms of design and being least affected by slipstream; however, the arrangement requires expensive submarine cables and high installation cost. Therefore, according to the analysis of economics, it was thought that 50MW complex should have less economics as BC ratio 0.95 than the series arrangement of main wind direction and I+80 series arrangement would be rather more economical. This economics evaluation provides comparison according to the arrangement of the development complex considering the uncertainty of the electricity price and gross construction cost. And it is expected that the result of economics evaluation would greatly differ by installation capacity, and the reason is that the cost of electric infrastructure takes up a higher portion than the gross construction cost of the development complex. The only way to compensate this part is to make the windpower development complex larger. It seems that it will be necessary to enhance spot applicability to evaluate economics afterwards and pay consistent attention to and conduct follow-up research on the economics evaluation of the complex construction.