기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
맞춤형 야구복의 효율적 생산관리를 위한 공정관리 분석
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 맞춤형 야구복의 효율적 생산관리를 위한 공정관리 분석
저자명
최경미,황현정,전정일,박용수,Choi. Kueng-Mi,Hwang. Hyun-Jung,Jun. Jung-Il,Park. Yong-Soo
간행물명
한국의류산업학회지
권/호정보
2012년|14권 4호|pp.597-606 (10 pages)
발행정보
한국의류산업학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

To increase the productivity and product quality of customized baseball jerseys, this study developed a multi-variable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers)was A-2, B-1, C-1. D-2, E-2, F-1, and G-1. This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team. Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.