- 교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구
- ㆍ 저자명
- 류성우,박권제,한승환,조윤호,Ryu. SungWoo,Park. Kwon-Jea,Han. SeungHwan,Cho. Yoon-Ho
- ㆍ 간행물명
- 한국도로학회논문집
- ㆍ 권/호정보
- 2014년|16권 3호|pp.109-117 (9 pages)
- ㆍ 발행정보
- 한국도로학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.