기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia
  • Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia
저자명
Banawi. Abdul-Aziz,Bilec. Melissa
간행물명
Journal of construction engineering and project management
권/호정보
2014년|4권 2호|pp.12-22 (11 pages)
발행정보
한국건설관리학회
파일정보
정기간행물|ENG|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.