- 고층건물 골조공사의 택트공정계획 최적화모델 개발에 관한 연구
- ㆍ 저자명
- 최민권,Choe. Min-Kwon
- ㆍ 간행물명
- 大韓建築學會論文集 : Journal of the architectural institute of Korea : Structure & construction / 構造系
- ㆍ 권/호정보
- 2014년|30권 9호|pp.69-78 (10 pages)
- ㆍ 발행정보
- 대한건축학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Tact scheduling is accepted as an efficient method that can reduce idle times during construction. To achieve an optimized tact system, various conditions should be satisfied. Many existing studies addressed various aspects related to applying tact system on construction job-site, including 1) crew balancing by working site rotation in a condominium construction with multiple buildings, 2) the tact system involved in synchronizing a single type of crew on finishing work, and 3) the development of a scheduling model of structural framing construction by working space zoning in a high-rise building. However, no existing studies attempt to apply the tact scheduling method to the structural framing construction for the single building having multiple units. Therefore, this study develops the optimization model and presents its application, which can schedule the tact system for a high-rise building. It is concluded that the proposed method can efficiently optimize the tact scheduling in case of multi-crew to milti-process model.