기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System
  • Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System
저자명
Hwang. Karam,Chung. Jong-Duk,Lee. Kibeom,Tak. Junyoung,Suh. In-Soo
간행물명
International journal of railway
권/호정보
2014년|7권 3호|pp.71-79 (9 pages)
발행정보
한국철도학회
파일정보
정기간행물|ENG|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

Subway systems have been a proved method of public transport and are widely used in major cities around the world. However, the time and cost it takes to construct such systems are very high, as it requires underground tunnels. Cities in various countries have implemented monorail systems as public railway transport as it can be more economical and quicker compared to subway systems in terms of construction. In addition, it provides more convenience towards the public as it is not affected to traffic, and also provides an aerial view of the city. However, the overall construction cost for monorail systems is still significantly high, and as a possible solution to further reduce the overall cost, implementation of ground-level stations and wireless power transfer technology has been proposed in this paper. A concept application layout of ground-level stations and wireless power transfer systems has been discussed, using the Daegu monorail Line 3 system as a simulation base. The expected cost for monorail systems implementing ground-level stations and/or wireless power transfer technology has been estimated based on literature survey, and was compared with the current construction cost of Daegu monorail system. Based on comparison, it has shown that implementation of ground-level stations are the most economical, and can be easily implemented for either starting or expanding the monorail line. Implementation of wireless power transfer technology is also economical, but is more feasible when starting a new monorail line as it requires components which will alter the configuration of the train and infrastructure.