- 자동차 부품 제조업체의 조립라인 개선을 위한 6시그마 프로젝트 사례 연구
- ㆍ 저자명
- 정민영,이영남,홍성훈,Jung. Min-Young,Lee. Young-Nam,Hong. Sung-Hoon
- ㆍ 간행물명
- 品質經營學會誌
- ㆍ 권/호정보
- 2010년|38권 3호|pp.439-448 (10 pages)
- ㆍ 발행정보
- 한국품질경영학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Since the six sigma strategy was first introduced to Motorola in 1987, it has been taken as an important business strategy to strengthen the competitiveness of leading companies in the global competitiveness environm ent. This paper presents a six sigma project to reduce the cycle time of assembly line in a medium size automotive part company. The project follows a structured methodology of DMAIC cycle which consists of Define, Measure, Analyze, Improve, and Control. A CTQ is determined based on COPQ analysis, and a process map is utilized for identifying process input variables. As a result of the project, two assembly lines are converted to cell line production lines. The cycle times become 55 sec./unit and 64 sec./unit from 64 sec./unit and 83 sec./unit at the beginning of the project, respectively.